
IEC10000172.vsd
IEC10000172 V1 EN-US
Figure 76: Configuring hardware channels directly to the function blocks
IEC10000173.vsd
IEC10000173 V1 EN-US
Figure 77: CMT: Hardware channels appearing in the Communication Management
Tool
2.
Right-click the IED in the plant structure and select
Communication Management to start
the Communication management tool.
3.
Select the DNP3 protocol from the new window and click
OK.
presents the
design of the two container windows, which open after the selection of DNP3.
•
The right window shows tabs for possible communication channels.
•
The left window has a drop down menu for signal selection and buttons for signal
IEC08000337.vsd
IEC08000337 V1 EN-US
Figure 78: CMT: Container window design when selecting DNP3 protocol
Procedure to move signals:
1.
Select one or several signals.
1MRK 511 284-UEN B
Section 9
DNP3 communication engineering
650 series
93
Engineering manual
© Copyright 2013 ABB. All rights reserved