Measuring the operate limit of set values.............................102
Completing the test.............................................................. 103
Directional phase overcurrent protection, four steps
OC4PTOC................................................................................. 103
Verifying the settings............................................................ 103
Completing the test.............................................................. 105
Instantaneous residual overcurrent protection EFPIOC ...........105
Four step residual overcurrent protection, (Zero sequence
or negative sequence directionality) EF4PTOC ....................... 106
Four step directional earth fault protection........................... 106
Four step non-directional earth fault protection....................107
Completing the test.............................................................. 107
Four step negative sequence overcurrent protection
NS4PTOC .................................................................................107
Completing the test.............................................................. 108
Sensitive directional residual overcurrent and power
protection SDEPSDE ................................................................108
Measuring the operate and time limit for set values.............109
Completing the test.............................................................. 114
Breaker failure protection, phase segregated activation and
output CCRBRF.........................................................................114
Checking the phase current operate value,
Checking the residual (earth fault) current operate value
IN> set below IP>................................................................. 114
Checking the re-trip and back-up times................................115
Verifying the re-trip mode..................................................... 115
Verifying the back-up trip mode............................................116
Verifying instantaneous back-up trip at CB faulty condition. 117
Verifying the function mode
Current/Contact....................... 117
Completing the test.............................................................. 118
Pole discordance protection CCPDSC......................................118
Verifying the settings............................................................ 118
Completing the test.............................................................. 119
Voltage-restrained time overcurrent protection VRPVOC......... 119
Verifying the settings............................................................ 119
Completing the test.............................................................. 123
Voltage protection...........................................................................123
Two step undervoltage protection UV2PTUV ...........................123
Verifying the settings............................................................ 123
Completing the test.............................................................. 124
Two step overvoltage protection OV2PTOV .............................124
Verifying the settings............................................................ 124
Table of contents
4
Line distance protection REL650 2.2 IEC
Commissioning manual
Summary of Contents for REL650 series
Page 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Page 2: ......
Page 24: ...18...
Page 28: ...22...
Page 38: ...32...
Page 54: ...48...
Page 58: ...52...
Page 178: ...172...
Page 182: ...176...
Page 188: ...182...
Page 196: ...190...
Page 206: ...200...
Page 207: ...201...