Test
equipment
UMeasure
Ph/N
Ph/Ph
IEC05000480-4-en.vsd
U-Bus
U-Line
N
IED
U3PBB1
N
UL1
UL2
UL3
N
Input Phase
L1,L2,L3
L12,L23,L31
UMeasure
Ph/N
Ph/Ph
Input Phase
L1,L2,L3
L12,L23,L31
U3PLN1
IEC05000480 V4 EN-US
Figure 21:
General test connection with three-phase voltage connected to the
line side
9.8.1.1
Testing the synchronizing function
M2377-21 v8
The voltage inputs used are:
UP3LN1
UL1, UL2 or UL3 line 1 voltage inputs on the IED
UP3BB1
Bus1 voltage input on the IED
Testing the frequency difference
M2377-116 v11
The frequency difference test should verify that operation is achieved when the
frequency difference between bus and line is less than set value of
FreqDiffMax
and above set value of
FreqDiffMin
. The test procedure below will depend on the
settings used. Input STARTSYN must be activated during the test.
FreqDiffMax
= 50.2 Hz
FreqDiffMin
= 50.01 Hz
tBreaker
= 0.080 s
1.
Apply voltages
Section 9
1MRK 506 383-UEN A
Testing functionality by secondary injection
136
Line distance protection REL650 2.2 IEC
Commissioning manual
Summary of Contents for REL650 series
Page 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Page 2: ......
Page 24: ...18...
Page 28: ...22...
Page 38: ...32...
Page 54: ...48...
Page 58: ...52...
Page 178: ...172...
Page 182: ...176...
Page 188: ...182...
Page 196: ...190...
Page 206: ...200...
Page 207: ...201...