Testing the liquid medium supervision for level alarm
and level lockout conditions................................................. 162
Testing the liquid medium supervision for temperature
Breaker monitoring SSCBR.......................................................163
Verifying the settings............................................................ 164
Completing the test.............................................................. 165
Limit counter L4UFCNT.............................................................167
Completing the test.............................................................. 168
ETPMMTR.................................................................................168
Verifying the settings............................................................ 168
Completing the test.............................................................. 170
Station communication................................................................... 170
Multiple command and transmit MULTICMDRCV /
MULTICMDSND........................................................................170
Basic IED functions........................................................................ 170
Parameter setting group handling SETGRPS........................... 170
Verifying the settings............................................................ 170
Completing the test.............................................................. 171
Exit test mode.................................................................................171
Section 10 Checking the directionality........................................... 173
Section 11 Commissioning and maintenance of the fault
clearing system............................................................ 177
Preparation...........................................................................178
Recording............................................................................. 179
Secondary injection.............................................................. 179
Alarm test............................................................................. 179
Self supervision check..........................................................179
Trip circuit check.................................................................. 179
Table of contents
Line distance protection REL650 2.2 IEC
7
Commissioning manual
Summary of Contents for REL650 series
Page 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Commissioning manual...
Page 2: ......
Page 24: ...18...
Page 28: ...22...
Page 38: ...32...
Page 54: ...48...
Page 58: ...52...
Page 178: ...172...
Page 182: ...176...
Page 188: ...182...
Page 196: ...190...
Page 206: ...200...
Page 207: ...201...