41
ER EC T I N G
—
Erecting
7.1
Before installation
The switchgear room must be clean and free of dust before installation.
7.1.1
Ambient conditions
The UPS room must be air conditioned. The room temperature must be b 5 - + 40 °C.
7.1.2
Floor cutouts
In case of cable connection from bottom, the following floor cut-outs need to be provided:
The holes in the gland plates need to be prepared on site, based on the number and cross section of the cables used.
50
10
0
800
1400
/1
600
500
600
800
Figure 7-01 Floor cut-outs for MNS-Up ups section
Floor cut-outs for other MNS 3.0 sections shall be done as described in the MNS Service Manual.
Summary of Contents for MNS-Up
Page 6: ... 01 Introduction ...
Page 8: ... 02 Safety first ...
Page 12: ... 03 General technical data ...
Page 16: ... 04 System description ...
Page 18: ... 05 Packing storage and transportation ...
Page 36: ... 06 Transport ...
Page 40: ... 07 Erecting ...
Page 47: ...47 ERECTING ...
Page 48: ... 08 MNS Up configuration ...
Page 52: ... 09 MNS Up Module installation ...
Page 55: ...55 MNS UP MODULE INSTALL ATION ...
Page 56: ... 10 Handling of EMC boards ...
Page 59: ...59 HANDLING OF EMC BOARDS ...
Page 60: ... 11 Communication boards ...
Page 62: ... 12 MNS 3 0 sections ...
Page 64: ... 13 Commissioning ...
Page 66: ... 14 Operating of MNS Up system ...
Page 68: ... 15 Tightening torques for screw connection in MNS Up ...
Page 72: ... 16 Spare parts ...
Page 74: ... 17 Onsite inspection and maintenance ...
Page 76: ... 18 Maintenance intervals ...
Page 81: ...81 MAINTENANCE INTERVALS ...
Page 83: ......