31
PAC K I N G , S TO R AG E A N D T R A N SP O R TAT I O N
5.3.4
MNS-Up Filter modules
MNS-Up filter modules must be removed from the MNS-Up section and packed in the original boxes before shipping.
5.4
Unloading and transport at site
The loads must be lowered onto a flat surface by either a crane or fork lift truck.
5.4.1
Ground transport
• By fork-lift truck (see Figure 3-13).
• By lifting and conveying devices.
• In an emergency, with rollers (min. 3 pieces). For roller transport the wooden cross-beams must be removed (only for
sections with transverse sections up to 1200 kg, see Figure 3-14).
• Switchgear sections could be transported in the vertical or horizontal position (see also chapeter 3.2.3)
• Tilting and canting must be avoided (see Figure 3-15).
• Single sections (sections without withdrawable modules, circuit breaker sections without circuit breakers) may be briefly
tilted into the horizontal position if the height of the doorway to the place of erection does not permit vertical transport.
ln this case the section sections must be supported over a wide area.
Figure 5-12
Fork-lift transport
Figure 5-13 Roller transport (only for weight of transport units up to 1200 kg)
Summary of Contents for MNS-Up
Page 6: ... 01 Introduction ...
Page 8: ... 02 Safety first ...
Page 12: ... 03 General technical data ...
Page 16: ... 04 System description ...
Page 18: ... 05 Packing storage and transportation ...
Page 36: ... 06 Transport ...
Page 40: ... 07 Erecting ...
Page 47: ...47 ERECTING ...
Page 48: ... 08 MNS Up configuration ...
Page 52: ... 09 MNS Up Module installation ...
Page 55: ...55 MNS UP MODULE INSTALL ATION ...
Page 56: ... 10 Handling of EMC boards ...
Page 59: ...59 HANDLING OF EMC BOARDS ...
Page 60: ... 11 Communication boards ...
Page 62: ... 12 MNS 3 0 sections ...
Page 64: ... 13 Commissioning ...
Page 66: ... 14 Operating of MNS Up system ...
Page 68: ... 15 Tightening torques for screw connection in MNS Up ...
Page 72: ... 16 Spare parts ...
Page 74: ... 17 Onsite inspection and maintenance ...
Page 76: ... 18 Maintenance intervals ...
Page 81: ...81 MAINTENANCE INTERVALS ...
Page 83: ......