
4
M N S - U P
SER V I C E M A N UA L
1 Introduction
1 Introduction 07
2
Safety first
2.1
Safety relevance 09
2.2
Understanding and managing the risk 09
2.3
Warning signs and labels 10
2.4
Basic principles and precautions to be observed 10
2.5
Areas of work 10
2.6
Five safety rules 11
2.7
Permit to work 11
2.8
Personal Protection Equipment (PPE)
11
2.9
Special considerations when working on electrical equipment
11
2.9.1 Capacitors
11
2.9.2 CT’s
11
2.9.3
Auxiliary or temporary supply
11
3
General technical data
3
General technical data 13
3.1
MNS-Up UPS General characteristics 14
4
System description
4.1
MNS-Up UPS section
17
5
Packing, storage and transportation
5.1 General 19
5.1
Recommended packing methods 22
5.2.1
The packing for normal road transport
22
5.2.2
The seaworthy packing
23
5.2.3
Horizontal transportation
29
5.2.4
Packaging of switchgear components
30
5.3
Handling of switchgear components 30
5.3.1
Circuit breaker
30
5.3.2
Withdrawable modules
30
5.3.3
MNS-Up UPS modules
30
5.3.4
MNS-Up Filter modules
31
5.4
Unloading and transport at site 31
5.4.1
Ground transport
31
5.4.4
Transport by crane
32
5.4.3
Transport by truck
34
5.5
Intermediate storage
34
5.5.1
Storage of spare modules
35
5.6
Enviromental conditions of transport, storage and installation
35
6 Transport
6.1
MNS-Up section 37
6.1.1
Rolling transport
37
6.1.2
Forklift transport
37
6.1.3
Crane transport
38
6.1.3.1 Guide values for permissible rope loading
38
6.2
MNS-Up Modules 39
6.3
Circuit breakers 39
7 Erecting
7.1
Before installation 41
7.1.1
Ambient conditions
41
7.1.2
Floor cutouts
41
Summary of Contents for MNS-Up
Page 6: ... 01 Introduction ...
Page 8: ... 02 Safety first ...
Page 12: ... 03 General technical data ...
Page 16: ... 04 System description ...
Page 18: ... 05 Packing storage and transportation ...
Page 36: ... 06 Transport ...
Page 40: ... 07 Erecting ...
Page 47: ...47 ERECTING ...
Page 48: ... 08 MNS Up configuration ...
Page 52: ... 09 MNS Up Module installation ...
Page 55: ...55 MNS UP MODULE INSTALL ATION ...
Page 56: ... 10 Handling of EMC boards ...
Page 59: ...59 HANDLING OF EMC BOARDS ...
Page 60: ... 11 Communication boards ...
Page 62: ... 12 MNS 3 0 sections ...
Page 64: ... 13 Commissioning ...
Page 66: ... 14 Operating of MNS Up system ...
Page 68: ... 15 Tightening torques for screw connection in MNS Up ...
Page 72: ... 16 Spare parts ...
Page 74: ... 17 Onsite inspection and maintenance ...
Page 76: ... 18 Maintenance intervals ...
Page 81: ...81 MAINTENANCE INTERVALS ...
Page 83: ......