4 Maintenance
4.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the IRB
930.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any service
work.
The maintenance must be done by qualified personnel in accordance with the
safety requirements set forth in the applicable national and regional standards and
regulations.
Note
If the IRB 930 is connected to power, always make sure that the IRB 930 is
connected to protective earth and a residual current device (RCD) before starting
any maintenance work.
For more information see:
•
Product manual - OmniCore C30
•
Product manual - OmniCore C90XT
•
Robot cabling and connection points on page 71
Product manual - IRB 930
79
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
4 Maintenance
4.1 Introduction
Summary of Contents for IRB 930
Page 1: ...ROBOTICS Product manual IRB 930 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 600: ...This page is intentionally left blank ...
Page 604: ......
Page 605: ......