Removing the pulley on the ball screw lower position
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page 46
2
xx2300000567
Remove the screws and washers.
3
Remove the pulley carefully.
CAUTION
If the ball screw nut or ball screw spline nut go
out of the screw shaft, the ball screw is destroyed.
Be careful when you do any work that may cause
this.
4
Placing the axis-3 and axis-4 timing belts into the outer arm
Note
Action
Place the axis-3 and axis-4 timing belts into the
outer arm.
1
Continues on next page
406
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.8 Replacing the outer arm
Continued
Summary of Contents for IRB 930
Page 1: ...ROBOTICS Product manual IRB 930 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 600: ...This page is intentionally left blank ...
Page 604: ......
Page 605: ......