Refitting the process hub
Use these procedures to refit the process hub.
Reconnecting the air hoses, CP/CS cabling and Ethernet cabling (if equipped)
Note
Action
Route the air hoses on the process hub behind
the bracket.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
1
xx2300000544
Insert the female head of the C1 cabling connector
to the bracket accordingly.
Tip
The mistake proofing measure has been applied
to the connectors, the connectors may be dam-
aged if excessive force is used.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
2
xx2300000542
For robots with C1 cabling
Reconnect the connector.
•
R2.C1
Tip
See the number markings on the air hoses for
help to find the corresponding air hoses.
The air hoses with the same number connect to
the same L-shaped connector.
3
For robots with C2 cabling
Reconnect the connector.
•
R1.C2
Tip
See the number markings on the air hoses for
help to find the corresponding air hoses.
The air hoses with the same number connect to
the same L-shaped connector.
4
Secure the C2 cabling to the C2 bracket with the
cable straps.
5
Continues on next page
Product manual - IRB 930
125
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the process hub
Continued
Summary of Contents for IRB 930
Page 1: ...ROBOTICS Product manual IRB 930 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 600: ...This page is intentionally left blank ...
Page 604: ......
Page 605: ......