Note
Action
xx2300000503
Remove the screws on the bracket to the cable
ferrule to release the cable ferrule with cable.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
2
Remove the screws on the base bracket to the
base from the SMB side.
3
Removing the axis-3 motor sub-assembly
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
DANGER
Make sure that the ball screw is supported with
something.
The sudden drop of the ball screw due the lost of
the axis-3 motor may cause danger.
2
xx2300000594
Remove the screws.
3
Remove the axis-3 motor sub-assembly.
4
Removing the axis-4 motor sub-assembly
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
346
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.6 Replacing the axis-4 timing belt
Continued
Summary of Contents for IRB 930
Page 1: ...ROBOTICS Product manual IRB 930 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 600: ...This page is intentionally left blank ...
Page 604: ......
Page 605: ......