Moving the converter package
■
Moving the converter package by fork-lift
WARNING!
Only use a heavy duty forklift that can carry the weight of the converter.
• Make sure that the reach of the fork lift is long enough. The package is wide
and the center of gravity is far from the edges.
• Do not tilt. The center of gravity is high.
• Move only in the upright position.
Moving
Pulling
Pushing
■
Moving the converter on rollers
Do not move the converter on rollers.
Mechanical installation 43
10
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...