Electrical safety in installation, start-up and maintenance
■
Precautions before electrical work
These instructions are for the qualified electricians who do work on the converter, generator
cable or generator.
WARNING!
Obey these instructions. If you ignore them, injury or death, or damage to the
equipment can occur. If you are not a qualified electrical professional, do not do
electrical installation or maintenance work. Do these steps before you do installation
or maintenance work.
1. Clearly identify the work location.
2. Disconnect all possible voltage sources.
• Open the main circuit breaker (Q1), disconnect, lock and attach a warning notice to
it. See section
Opening and disconnecting the main circuit breaker (page 17)
.
• Open the charging circuit switch-disconnector (Q10). See section
charging circuit from the main circuit (page 19)
.
• Open and lock out the auxiliary voltage circuit breakers (Q2 and Q3). See section
Disconnecting the auxiliary power supply (page 20)
.
• Note the voltage sources from UPS: Open the circuit breaker F31.
• Disconnect any external dangerous voltages from the control circuits (such as relay
outputs).
• Open, disconnect and lock out the breaker of the grid transformer as the main circuit
breaker of the converter does not remove the voltage from the grid cable busbars
and some auxiliary circuits. Attach a warning notice to the disconnector.
• Lock the turbine rotor (and generator shaft).
• Open the safety switch between the generator-side converter and the generator (if
any).
• After you disconnect the converter, always wait for five minutes to let the intermediate
circuit capacitors discharge before you continue.
3. Protect any other energized parts in the work location against contact.
4. Take special precautions when close to bare conductors.
14 Safety instructions
3
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...