Years from start-up
Maintenance task/object
…
12
11
10
9
8
7
6
5
4
3
2
1
0
Replacement
R
Cooling fans
R
I
I
R
I
I
Water-glycol coolant with inhibitor
(see
Note 1
below)
R
I
I
I
I
I
R
I
I
I
I
I
Memory backup battery in the
BCU control unit
P
P
P/R
P
P
P
R
P
P
P
P
P
ABB-SACE main circuit breaker
maintenance (see
Note 2
below)
I
I
R
I
I
I
I
I
I
I
I
I
UPS
R
I
R
I
R
I
R
I
R
I
R
I
UPS battery
Inspection and/or performance
I
I
I
I
I
I
I
I
I
I
I
I
Cooling liquid pipe connections
I
I
I
I
Fiber optic cables (connections)
P
P
P
P
Tightness of terminals
I
I
I
I
Quick connector of the converter
module
I
I
I
I
I
I
I
I
I
I
I
I
Condition of contactors
I
I
I
I
I
I
I
I
I
I
I
I
Condition of capacitors
I
I
I
I
I
I
I
I
I
I
I
I
Checking ambient conditions
(dustiness, corrosion, temperat-
ure)
I
I
I
I
I
I
I
I
I
I
I
I
Checking the quality of auxiliary
voltage
Improvements
I
I
I
I
I
I
I
I
I
I
I
I
I
Firmware and hardware upgrade
based on product notes
Measurements and tests
P
P
P
P
P
P
P
P
P
P
P
P
Functional test with net voltage
P
P
P
P
P
P
P
P
P
P
P
P
Basic measurements with supply
voltage
Spare parts
P
I
P
I
P
I
P
I
P
I
P
I
Spare parts
3AXD10000552946
Symbols
Inspection (visual inspection and maintenance action if needed)
I
Performance
of on/off-site work (commissioning, tests, measurements or other work)
P
Replacement
R
Maintenance and component replacement intervals are based on the assumption that the
equipment is operated within the specified ratings and ambient conditions. ABB recommends
annual inspections to ensure the highest reliability and optimum performance.
Long term operation near the specified maximum ratings or ambient conditions may require
shorter maintenance intervals for certain components. Consult your local ABB Service
representative for additional maintenance recommendations.
72 Maintenance
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...