Quick installation, commissioning and operation flowchart
See
Task
Plan the installation. Check: ambient conditions, ratings,
required external cooling circuit arrangements, compat-
ibility of the generator, power cable connection, etc.
Planning the electrical installation (page 49)
Option manuals (if optional equipment is included)
Select the cables.
Checklist before mechanical installation (page 42)
Unpack and check the equipment.
Check the type code indicated on the type designation
label against the original order.
Check that all necessary option modules and equipment
are present and correct.
Only intact converters may be started up!
Checklist before mechanical installation (page 42)
Check the installation site.
Route the cables.
Mechanical installation (page 41)
Move the converter to the installation site and attach it
to the floor.
Cooling and heating (page 119)
Connect an external cooling circuit to the converter.
Checking the insulation of the assembly (page 61)
Check the insulation of the generator and the generator
cable.
Electrical installation (page 61)
Connect the power cables. Connect the control and the
auxiliary control cables.
Installation checklist (page 69)
Check the installation.
Firmware manual / start-up guide
Commission the converter.
24 Introduction to the manual
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...