Installation checklist
Contents of this chapter
This chapter contains instructions for checking the installation of the wind turbine converter.
Before you start
Check the mechanical and electrical installation of the converter before start-up. Go through
the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described below. Do
the tasks described in the safety instructions of the converter. If you ignore them,
injury or death, or damage to the equipment can occur.
1. Open the main disconnector of the converter and lock it to open position.
2. Ensure by measuring that the converter is not powered.
7
Installation checklist 69
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...