Checklist
Make sure that …
The ambient operating conditions meet the specifications given in the technical data.
The converter has been fixed properly on an even, horizontal and non-flammable floor and if necessary
due to vibration etc, also from top to the wall or roof.
The cooling circuit joints are tight.
All bleed and drain valves have been closed.
The internal cooling circuit has been filled with coolant that meets the specification.
The internal cooling circuit has been bleeded.
There is an adequately sized protective earth (ground) conductor between the converter and the main
grounding busbar of the wind turbine.
The generator is properly grounded.
All protective earth (ground) conductors have been connected to the appropriate terminals and the
terminals have been tightened (pull the conductors to check).
The voltage of the grid transformer matches the nominal voltage of the grid-side converter. Check the
type designation label.
The grid cable or grid busbars have been connected to the appropriate terminals, the phase order is
right, and the terminals have been tightened. (Pull the conductors to check.) For tightening torques,
see the technical data.
The generator cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened. (Pull the conductors to check.) For tightening torques, see the
technical data.
The generator cable (and DC resistor cable, if present) has been routed away from other cables.
Converters which have a DC chopper (D150) with a customer-acquired and installed DC res-
istor: The DC resistor has been installed, connected to the appropriate terminals, and the terminals
have been tightened. (Pull the conductors to check.)
Test the DC resistor installation by measuring. Measure the resistance of each DC resistor from the
cabinet DC resistor connectors. Ensure that the resistance value is within the allowed minimum and
maximum values defined for the chopper circuit.
The control cables have been connected to the appropriate terminals, and the connections are tight.
(Pull the conductors to check.)
There are no tools, foreign objects or dust from drilling inside the converter.
The cover for cabling protection (if present) on top of the generator-side converter modules has been
removed.
All shrouds and cover of the generator connection box are in place. Cabinet doors have been closed.
The converter is ready for start-up.
70 Installation checklist
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...