background image

1 Installation

Part  1

                Installation

Part  2

               Electrical Connection

A

 Check Packing List

User

Manual

Wall-mounting bracket

PV Terminal

Monitoring device 1pcs

3m battery communication cable  1pcs

Battery terminal 1 

pairs

Meter with 3 CTs 1 

pairs

PE terminal 1pcs

COM2 connector set 1pcs

Expansion plug set

M5 screws

ON-GRID

BACK

-UP

On-grid connector set (Red)  1pcs

1pcs

5pcs

1pcs

Inverter 1pcs

4.0K-25A-3P 2 

pairs

 / 10K-40A-3P 4 

pairs

Back-up connector set (Black)  1pcs

10m meter communication cable  1pcs

C

Installation Space

300mm

500mm

500mm

300mm

E

 Mark the position and drill holes

F

 Fix wall bracket

G

 Mounting inverter

H

 Grounding terminal connection

Part  1

                Installation

Part  2

               Electrical Connection

Part  1

                Installation

Part  2

               Electrical Connection

D

 Monitoring Device Installation

E

Meter and CT connection

UTILITY 

GRID

L1

L2

L3

N

PE

C

AC Connection

Allen Key

50mm

8mm

User guide 3pcs

B

  Installation Location

D

 Installation Angle

2 Electrical Connection

A

Cable Requirements

Cable types 

Cable requirements

Outside diameter                     Conductor core section

AC cable

PV cable

Battery power cable

13.0-18.0 mm

5.9-8.8 mm

5.0-8.0 mm

2.5-10.0 mm²

2.5-4.0 mm²

10 mm²

Part  1

                Installation

Part  2

               Electrical Connection

B

Electrical wiring diagram

AC Connector: 

Please distinguish the on-grid and back-up connector, On-grid connector is red 

and Back-up connector is Black.

Battery power cable: 

If the conductor core of the battery cable is too small, which may cause poor 

contact between the terminal and the cable, please use the cable specified in the above table, or 
contact Wattsonic to purchase terminals of other specifications.

CT-2

CT-3

CT-1

L1

L2

L3

N

N

L

S2

S1

S2

S1

S2

S1

002456

UTILITY METER

FOR BILLING

PURPOSES

CT-2

CT-3

CT-1

S1(Red)

S2(Black)

AC Br

eak

er

AC Br

eak

er

Solint

eg Smart 

Met

er

To Solinteg 

Meter

House

Grid

The direction of the arrow is 

consistent with the direction of 

the arrow inside the CT.

ON-GRID

P

E

N

L

3

L

2

L

1

UTILIT

GRID

S1(
Re

d)

S2(Yellow)

002456

UTILIT

METE

R

FOR BILLING

PURPOSES

CT

-3

CT

-2

CT

-1

Lo

ad

s

AC

 B

re

ak

er

AC

 B

re

ak

er

To

 Solinteg Mete

r

AC Breaker

AC Breaker

AC Breaker

PV

 Modul

es

3-Phase

Lo

ad

s

1-Phase

Lo

ad

s

Wattsonic Smart Meter

To Wattsonic Meter

S1(Red)

S2(Yellow)

Quick Installation Guide

Wattsonic Gen3 Hybrid Inverter

4/5/6/8/10/12KW-25A-3P

10/12/15/20KW-40A-3P

Reviews: