Installation checklist
Contents of this chapter
This chapter contains instructions for checking the installation of the wind turbine converter.
Before you start
Check the mechanical and electrical installation of the converter before start-up. Go through
the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described below. Do
the tasks described in the safety instructions of the converter. If you ignore them,
injury or death, or damage to the equipment can occur.
1.
Open the main disconnector of the converter and lock it to open position.
2.
Ensure by measuring that the converter is not powered.
7
Installation checklist 67
Summary of Contents for ACS880-77CC
Page 1: ...ABB WIND TURBINE CONVERTERS ACS880 77CC wind turbine converters Hardware manual...
Page 2: ......
Page 4: ......
Page 10: ...10...
Page 17: ...5 1 3 4 6 8 7 2 Safety instructions 17...
Page 22: ...22...
Page 40: ...40...
Page 60: ...60...
Page 73: ...2a 3b 4c 5 Air flow direction is towards the converter module Maintenance 73...
Page 104: ...104...
Page 108: ...Description CAN bus connection XCAN XCAN 108 BCU x5 control unit...
Page 112: ...112 Dimension drawings...
Page 113: ...Dimension drawings 113...
Page 114: ...114 Dimension drawings...
Page 126: ...126...