Planning the cooling system
■
Connection to a cooling unit
General requirements
Equip the system with an expansion tank to damp pressure rise due to volume changes
when the temperature varies. Keep the pressure within the limits specified in section
. Install a pressure regulator to ensure that the maximum permissible
operating pressure is not exceeded.
Install a bleeding valve at the highest point of the cooling circuit. Bleeding valve is not
included in the ABB converter delivery as standard.
The materials used in the cooling system are listed in section
Coolant temperature control
The temperature of the coolant in the internal cooling circuit must be kept within the limits
specified in section
. Note that the minimum temperature depends
on ambient temperature and relative humidity.
The following diagram shows an example of coolant temperature control using the three-way
valve in the external cooling circuit. Part of the infeed coolant flow is directed into the return
pipe through a three-way valve without letting it circulate in the internal cooling circuit if the
coolant in the internal circuit is too cold.
TC
1
2
3
4
Internal circuit
1
External circuit
2
Infeed
3
Return
4
Cooling and heating 117
Summary of Contents for ACS880-77CC
Page 1: ...ABB WIND TURBINE CONVERTERS ACS880 77CC wind turbine converters Hardware manual...
Page 2: ......
Page 4: ......
Page 10: ...10...
Page 17: ...5 1 3 4 6 8 7 2 Safety instructions 17...
Page 22: ...22...
Page 40: ...40...
Page 60: ...60...
Page 73: ...2a 3b 4c 5 Air flow direction is towards the converter module Maintenance 73...
Page 104: ...104...
Page 108: ...Description CAN bus connection XCAN XCAN 108 BCU x5 control unit...
Page 112: ...112 Dimension drawings...
Page 113: ...Dimension drawings 113...
Page 114: ...114 Dimension drawings...
Page 126: ...126...