■
Connection procedure
WARNING!
See and obey the safety instructions of the converter. If you ignore them, injury or
death, or damage to the equipment can occur.
WARNING!
Apply grease to stripped aluminum conductors before attaching them to non-coated
aluminum cable lugs. Obey the grease manufacturer’s instructions.
Aluminum-aluminum contact can cause oxidation in the contact surfaces.
1.
Open the door of the main breaker cubicle. Unlock the handle, release it from the holder
and turn upwards to release the door locking mechanism.
2.
Remove the shroud that protects the grid cable terminals.
3.
Lead the grid cables into the inside of the cubicle.
4.
Fasten the grid cables to the grid connection terminals. Connect the phase conductors
to terminals L1, L2 and L3. Tighten the conductors to 120 N·m (89 lbf·ft).
5.
Connect ground conductors or cables to the cabinet PEN (ground) busbar.
6.
Provide support for the connections whenever necessary.
7.
Refit all shrouds removed earlier.
8.
Close the door.
Electrical installation 63
11
Summary of Contents for ACS880-77CC
Page 1: ...ABB WIND TURBINE CONVERTERS ACS880 77CC wind turbine converters Hardware manual...
Page 2: ......
Page 4: ......
Page 10: ...10...
Page 17: ...5 1 3 4 6 8 7 2 Safety instructions 17...
Page 22: ...22...
Page 40: ...40...
Page 60: ...60...
Page 73: ...2a 3b 4c 5 Air flow direction is towards the converter module Maintenance 73...
Page 104: ...104...
Page 108: ...Description CAN bus connection XCAN XCAN 108 BCU x5 control unit...
Page 112: ...112 Dimension drawings...
Page 113: ...Dimension drawings 113...
Page 114: ...114 Dimension drawings...
Page 126: ...126...