Checklist
Make sure that …
The ambient operating conditions meet the specifications given in the technical data.
The converter has been fixed properly on an even, horizontal and non-flammable floor and if necessary
due to vibration etc, also from top to the wall or roof.
The cooling circuit joints are tight.
All bleed and drain valves have been closed.
The internal cooling circuit has been filled with coolant that meets the specification.
The internal cooling circuit has been bleeded.
The cooling air flows freely.
The filters of the door air inlets are installed.
There is an adequately sized protective earth (ground) conductor between the converter and the main
grounding busbar of the wind turbine.
The generator is properly grounded.
All protective earth (ground) conductors have been connected to the appropriate terminals and the
terminals have been tightened (pull the conductors to check).
The voltage of the grid transformer matches the nominal voltage of the grid-side converter. Check the
type designation label.
The grid cable or grid busbars have been connected to the appropriate terminals, the phase order is
right, and the terminals have been tightened. (Pull the conductors to check.) For tightening torques,
see the technical data.
The generator cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened. (Pull the conductors to check.) For tightening torques, see the
technical data.
The generator cable (and DC resistor cable, if present) has been routed away from other cables.
Converters which have a DC chopper (D150) with a customer-acquired and installed DC res-
istor: The DC resistor has been installed, connected to the appropriate terminals, and the terminals
have been tightened. (Pull the conductors to check.)
Test the DC resistor installation by measuring. Measure the resistance of each DC resistor from the
cabinet DC resistor connectors. Ensure that the resistance value is within the allowed minimum and
maximum values defined for the chopper circuit.
The control cables have been connected to the appropriate terminals, and the connections are tight.
(Pull the conductors to check.)
Test the LCL filter installation by measuring. Measure the LCL filter capacitance symmetrically in each
phase in the grid-side converter cubicle.
There are no tools, foreign objects or dust from drilling inside the converter.
The cover for cabling protection on top of the generator-side converter modules has been removed.
All shrouds and cover of the generator connection box are in place. Cabinet doors have been closed.
The converter is ready for start-up.
68 Installation checklist
Summary of Contents for ACS880-77CC
Page 1: ...ABB WIND TURBINE CONVERTERS ACS880 77CC wind turbine converters Hardware manual...
Page 2: ......
Page 4: ......
Page 10: ...10...
Page 17: ...5 1 3 4 6 8 7 2 Safety instructions 17...
Page 22: ...22...
Page 40: ...40...
Page 60: ...60...
Page 73: ...2a 3b 4c 5 Air flow direction is towards the converter module Maintenance 73...
Page 104: ...104...
Page 108: ...Description CAN bus connection XCAN XCAN 108 BCU x5 control unit...
Page 112: ...112 Dimension drawings...
Page 113: ...Dimension drawings 113...
Page 114: ...114 Dimension drawings...
Page 126: ...126...