22 EN – R6…R9 Quick installation guide
R0-
R4
R6-
R9
R6-
R9
EN
DA
DE
ES
FI
FR
IT
NL
PL
PT
RU
SV
TR
ZH
Default I/O connections
Default I/O connections of the ABB Standard macro are shown below.
max.
500 ohm
1…10 kohm
S1
AI1 U/I
Voltage/Current selection for AI1:
S2
AI2 U/I
Voltage/Current selection for AI2:
X1
Reference voltage and analog inputs and outputs
1
SCR
Signal cable shield (screen)
2
AI1
Output frequency/speed reference
: 0…10 V
3
AGND
Analog input circuit common
4
+10V
Reference voltage 10 V DC
5
AI2
Not configured
6
AGND
Analog input circuit common
7
AO1
Output frequency:
0…20 mA
8
AO2
Output current:
0…20 mA
9
AGND
Analog output circuit common
S3
AO1 I/U
Voltage/Current selection for AO1:
X2 & X3
Aux. voltage output and programmable digital inputs
10
+24V
Aux. voltage 24 V DC, max. 250 mA
11
DGND
Aux. voltage output common
12
DCOM
Digital input common for all
13
DI1
Stop (0) / Start (1)
14
DI2
Forward (0) / Reverse (1)
15
DI3
Constant frequency/speed selection
16
DI4
Constant frequency/speed selection
17
DI5
Ramp set 1 (0) / Ramp set 2 (1)
18
DI6
Not configured
X6, X7, X8
Relay outputs
19
RO1C
Ready run
250 V AC / 30 V DC
2 A
20
RO1A
21
RO1B
22
RO2C
Running
250 V AC / 30 V DC
2 A
23
RO2A
24
RO2B
25
RO3C
Fault (-1)
250 V AC / 30 V DC
2 A
26
RO3A
27
RO3B
X5
EIA-485 Modbus RTU
29
B+
Embedded Modbus RTU (EIA-485)
30
A-
31
DGND
S4
TERM
Serial data link termination switch
S5
BIAS
Serial data link bias resistors switch
X4
Safe torque off
34
OUT1
Safe torque off. Factory connection. Both circuits
must be closed for the drive to start. See chapter
The Safe torque off function
in A
CS580-01 (0.75
to 250 kW) hardware manual
(3AXD50000018826
[English]).
35
OUT2
36
SGND
37
IN1
38
IN2
X10
24 V AC/DC
40
24 V AC/DC+ in Ext. 24V AC/DC input to power up the control unit
when the main supply is disconnected.
41
24 V AC/DC- in
U
I
U
I
U
I
1)
All control boards do not have switches S1, S2 and S3. In that case, select voltage or current
for inputs AI1
and
AI2 and output AO1 with parameters. See the firmware manual.
Total load capacity of the Auxiliary voltage 24V (X2:10) is 6.0 W (250 mA / 24 V DC).
Wire sizes: 0.14…2.5 mm
2
(26…16 AWG): All terminals
Tightening torques: 0.5…0.6 N·m (0.4 lbf·ft)
1)
1)
Summary of Contents for ACS580-01 drives
Page 12: ...2016 ABB Oy All Rights Reserved 3AXD50000009286 Rev D MUL EFFECTIVE 2016 02 17...
Page 64: ...64 FI R6 R9 asennuksen pikaopas R0 R4 R6 R9 R6 R9 FI DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 74: ...74 FR Guide d installation R6 R9 R0 R4 R6 R9 R6 R9 FR DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 124: ...124 RU R6 R9 R0 R4 R6 R9 R6 R9 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 144: ...144 TR R6 R9 H zl kurulum k lavuzu R0 R4 R6 R9 R6 R9 TR DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 154: ...154 ZH R6 R9 R0 R4 R6 R9 R6 R9 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 156: ...156 R6 R9 Quick installation guide R0 R3 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 159: ...159 DA DE ES FI FR IT NL PT RU SV TR CN R6 R9 Figures E 1 2 3 IP21 IP21 IP21 1 IP55...
Page 160: ...160 DA DE ES FI FR IT NL PT RU SV TR CN 3AXD50000009286 Rev D...
Page 162: ...2016 ABB Oy All Rights Reserved 3AXD50000009286 Rev D MUL EFFECTIVE 2016 02 17...
Page 170: ...170 EN Quick start up guide R0 R4 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 178: ...178 DA Vejledning til hurtig opstart R0 R4 DA DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 186: ...186 DE Kurzanleitung f r die Inbetriebnahme R0 R4 DE DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 194: ...194 ES Gu a r pida de puesta en marcha R0 R4 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 202: ...202 FI Pika aloitusopas R0 R4 FI DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 210: ...210 FR Guide de mise en route R0 R4 FR DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 218: ...218 IT Guida rapida all avviamento R0 R4 IT DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 226: ...226 NL Beknopte opstartgids R0 R4 NL DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 234: ...234 PL Skr cona instrukcja uruchamiania R0 R4 PL DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 242: ...242 PT Guia de in cio r pido R0 R4 PT DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 243: ...RU 243 R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH RU RU R6 R9 115 R6 R9 1...
Page 244: ...244 RU R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH OK...
Page 246: ...246 RU R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH cos...
Page 247: ...RU 247 R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH 2 Fieldbus...
Page 248: ...248 RU R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH 2 I O 2...
Page 249: ...RU 249 R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH 2...
Page 250: ...250 RU R0 R4 RU DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 258: ...258 SV Snabbguide f r idrifttagning R0 R4 SV DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 266: ...266 TR H zl devreye alma k lavuzu R0 R4 TR DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 267: ...ZH 267 R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH ZH 145 ZH R6 R9 R6 R9 Options Menu 1 OK...
Page 268: ...268 ZH R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 270: ...270 ZH R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 271: ...ZH 271 R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH 2 PID 2...
Page 272: ...272 ZH R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH I O I O I O I O I O 2 2...
Page 273: ...ZH 273 R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 274: ...274 ZH R0 R4 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH...