6.1.8 Parameter window “Setpoint general”
Setpoint larger when sending change
Options:
-
Inactive
- 0.1 K
- 0.2 K
- 0.3 K
- 0.4 K
- 0.5 K
- 0.6 K
- 0.7 K
- 0.8 K
- 0.9 K
- 1.0 K
If this parameter is set to a difference, the associated 2-byte communication object “Setpoint temperature” sends
its current temperature whenever this parameter changes more than the specified difference.
Cyclic sending of setpoint (0 – inactive, min)
Options:
-
0
- 1
- 2
- …
- 60
If the setpoint is to be sent cyclically independent of a change, the parameter “Cyclic sending of setpoint” must be
set to a time. This may be necessary, for instance, with a higher-level boiler that expects to receive setpoints and
current values within a certain time period. If values are not received, a predefined supply line temperature is set that