MYLOS
®
Building Automation |
Commissioning 25
MYLOS
®
Building Automation
Commissioning
Number of output channels
Options:
- 1 channel (dual pipe system) for heat / cool
-
2 channels (four-pipe system) for heat / cool
If the “Thermostat functions” parameter has been selected, it can be used to specify whether a separate communication
object or a common communication object for heating or cooling is provided for the control value. The setting “1
channel (dual pipe system) for heat / cool” is required for dual pipe systems and the setting “2 channels (four-pipe
system) for heat / cool” is required for four-pipe systems.