Planning
CMW
Planning
1.
Gather information about jobsite. See page 52.
2.
Inspect jobsite. See page 53.
3.
Classify jobsite. See page 54.
4.
Select chain and teeth to match your soil type, if necessary. See page 102.
5.
Check supplies and prepare equipment. See page 56.
6.
Haul equipment to jobsite. See page 66.
Trenching
1.
Start unit. See page 58.
2.
Position tractor and controls. See page 72.
3.
Begin trenching. See page 73.
4.
Complete the installation. See page 73.
5.
Backfill the trench. See page 106.
6.
Shut down tractor. See page 60.
Plowing
1.
Start unit. See page 58.
2.
Position tractor and controls. See page 78.
3.
Attach product. See page 78.
4.
Begin plowing. See page 80.
5.
Complete the installation. See page 80.
6.
Shut down tractor. See page 60.
*Always follow manufacturer instructions*