29
Refill Container 1 and 2:
These removable containers store new resin, which is added to the
RDM as needed, prior to the start of a build.
Blade Rest:
The blade rest area is used to stow the removable recoater blade when changing
RDMs.
Leveling Container:
The system requires precise control of the resin height. This container acts
as a storage reservoir.
Note: Under normal operations, this container is not to be removed.
Valve Assembly:
These valves control the resin flow from the refill containers and recirculate
resin.
Leveling Pump:
The leveling pump controls the resin height in the RDM by moving resin to or
from the leveling container.
RDM Heater Power Switch:
This switch enables warm up of the RDM, whether in the system or
offline.
I/O Connector:
This connector is the interface for all communication and motion control
between the RDM and the Viper Pro SLA system.
Gross Fill/Circulation Pump:
This pump transfers resin from the refill containers into the RDM,
and recirculates resin already in the RDM.
70696 Revision 1C 27-Aug-08