Installation Manual
H3C S7500 Series Ethernet Switches
Appendix B N68 Cabinet Installation
B-25
Table B-4
Determine installation hole positions based on the template
Step
Operation
Remarks
1
Put the marking template on the floor
as required.
Figure B-24 shows the
marking template.
2
Mark the positions of all the
expansion bolts on the floor
according to the template. The
semi-circle notch of the template
indicates the front of the cabinet.
Each cabinet needs four
expansion bolt holes.
Caution:
Make sure that the template direction is correct.
Front
Back
Right
Left
800
600
687
413
Figure B-24
Marking template (only for installation on cement floor)
3) Drill
holes.
Use M12 expansion bolts to fix supports on the floor. Use a percussion drill with 16 bit to
drill holes.
When drilling holes, hold the drill handle firmly with both hands, keeping the bit
perpendicular to the floor to prevent damages to the floor or tilted holes.