Installation Manual
H3C S7500 Series Ethernet Switches
Appendix B N68 Cabinet Installation
B-9
Insulation test
No
Yes
End
Level the cabinet
Combine cabinets
Fix the cabinet
Yes
No
Locate the cabinet
Start
Insulation test
End
Level the cabinet
Combine cabinets
Fix the cabinet
Insulation test
End
Level the cabinet
Combine cabinets
Fix the cabinet
Position the cabinet
Start
Does it pass insulation test?
End
Level the cabinet
Combine cabinets
Fix the cabinet
Does it satisfy requirements ?
Figure B-8
Install cabinets with feet on cement floor
I. Positioning the cabinets
1)
Determine where to install the cabinets.
Before installing the cabinets, you need to plan installation space first. Sufficient space
must be provided in front of and at the back of the cabinet for maintenance.
2) Make
marks.
You can make marks in two ways: determining installation hole positions based on
layout and determining installation hole positions based on the template.