Chapter 3 - Routine Maintenance
Confidential and Proprietary Information of ZTE CORPORATION 75
Waterproof adhesive tape, sealing adhesive tape, insulation tape
[
Test procedure
]
Check whether there is leakage and crack in the antenna feeder terminals
and the lightning protection grounding kits.
[
Normal result
]
No leakage or crack is found.
[
Troubleshooting
]
Follow the steps below to make waterproof treatment.
1.
Power off all the ETRM modules on PSM.
2.
Remove the original waterproof material.
3.
Wrap the waterproof adhesive tape at the connector, followed by the
sealing adhesive tape, and finally the insulation tape.
4.
Wrap the adhesive tape layer by layer from the bottom up, to avoid
rainwater leakage.
5.
Re-power on all the ETRM modules.
[
Recovery after test
]
None.
Checking E1 Interfaces
[
Instruments and meters
]
None.
[
Test procedure
]
1.
Check whether the E1 cable is aging, distorted, extruded, deformed or
too tight.
2.
Check whether the E1 connector is fixed.
3.
Observe status of the indicators on the CMM panel, to see whether the
E1 interface is fault.
[
Normal result
]
1.
The E1 cable is not aging, distorted, extruded, transformed or too tight.
2.
The E1 terminal is fixed.
3.
The red SYN indicator on the CMM panel is off.
[
Troubleshooting
]
Содержание ZXG10 BS21
Страница 4: ...This page is intentionally blank ...