![Zte ZXG10 BS21 Скачать руководство пользователя страница 202](http://html1.mh-extra.com/html/zte/zxg10-bs21/zxg10-bs21_maintenance-manual_940269202.webp)
ZXG10 BS21 (V2.2) Compact Outdoor BTS for GSM Maintenance Manual
188
Confidential and Proprietary Information of ZTE CORPORATION
vi.
Connect the newly-made jumper.
vii.
At the other end of the jumper, measure the indexes of the
antenna feeder performance by an antenna feeder analyzer (SITE
MASTER).
viii.
If the indexes are normal, connect the jumper to the antenna
feeder interface at the top of the cabinet.
ix.
Power on all the ETRM modules again on the PSM module panel.
4.
Confirmation after replacement
i.
Observe the running status of the ETRM and the AEM. If the
indicator is normal, the replacement is basically successfully.
ii.
Make a test call to check whether the BS runs normally after the
replacement.
Tower Top 1/2” Soft Jumper
Replacement
1.
Tools
i.
LDF4 block cutting device
ii.
LDF4 block installation tools
iii.
Adjustable wrenches (2)
iv.
Hacksaw
v.
Assorted file
vi.
Paper knife
vii.
Adjustable hot air blower
viii.
Multimeter
ix.
Antenna feeder analyzer
x.
Tools for safely climbing
2.
Preparation:
i.
Perform the fault observation and analysis and determine the
replacement is necessary.
ii.
Prepare a good spare part with the same type as that of the faulty
jumper.
iii.
Prepare a damp-proof bag and carton, as well as some labels for
identification.
3.
Procedure
i.
Power off all the ETRM modules on the PSM module panel.
ii.
Remove the jumper by an adjustable wrench, and then remove
connectors at its two ends, to check whether the connectors are
faulty, if they are perfect, use them again.
Содержание ZXG10 BS21
Страница 4: ...This page is intentionally blank ...