Appendix A - Replacement of Modules and Parts
Confidential and Proprietary Information of ZTE CORPORATION 189
iii.
Put the replaced faulty jumper in a damp-proof bag, label it and
mark its type and fault. Store it properly in the carton. Label the
carton for easy identification and handling in the future.
iv.
Cut a proper length of jumper according to the real situation, and
make a new jumper in the way described in the manual for making
connector in the package of the connector.
v.
Test the newly-made jumper, especially test its connection and
disconnection with the multimeter.
Note:
Make the jumper safely and avoid the personal injury due to improper use of
sharp tools.
Pay attention to the handling of the feeder leftover. If sundries such as copper
bits are filtered into the connector, the performance of the antenna feeder system
will be influenced.
During operations high above the ground, protect the tools being used to
prevent them from dropping and hurting personnel on the ground.
vi.
Install the new jumper and test the antenna feeder indexes.
¾
Receiving/transmitting jumpers
Lay the new tower-top jumper to the transmitting antenna and 7/8”
feeder, connect the connectors, make waterproof bends, and then
measure the cabinet top jumper for the antenna feeder
performance indexes by an antenna feeder analyzer (SITE MASTER)
¾
Diversity reception jumper
Connect jumpers, make waterproof bends and conduct waterproof
treatments to the connectors.
Note:
In the process of making waterproof treatment to the connectors of the
antenna feeder system, make sure that:
Wrap it with waterproof tape, sealing tape and insulating tape in turn.
The jumper should be bent softly without too large angle, and generally, the
bend radius is over 15 times of the jumper radius.
Insulating tapes should be wrapped from the bottom to the top in case of
rainwater leaking.
vii.
Power on all the ETRM modules on the PSM module panel again.
4.
Confirmation after replacement
i.
Observe the running status of the ETRM and the AEM. If the
indicator is normal, the replacement is basically successfully.
ii.
Make a test call to check whether the BS runs normally after the
replacement.