Chapter 4: Maintenance
138
ZP2-A Series Installation Manual
Battery start-up
Note:
This start-up option is not available for large cabinet control panels with a
10 A power supply.
The battery start-up option may be required after replacing batteries after a low
battery indication when mains power is not available.
To power up the control panel from the batteries, press the battery start button on
the control panel PCB (marked as BAT, see Figure 28 below). Keep the button
pressed for approximately 5 seconds.
Figure 28: Battery start-up button
Содержание ZP2-AF2-P
Страница 1: ...ZP2 A Series Installation Manual P N 00 3281 501 2003 01 ISS 22NOV22...
Страница 50: ...Chapter 2 Installation 44 ZP2 A Series Installation Manual...
Страница 140: ...Chapter 3 Configuration and commissioning 134 ZP2 A Series Installation Manual...
Страница 153: ...Chapter 5 Technical specifications ZP2 A Series Installation Manual 147 Figure 29 Large cabinet dimensions and views...
Страница 154: ...Chapter 5 Technical specifications 148 ZP2 A Series Installation Manual Figure 30 Small cabinet dimensions and views...
Страница 168: ...Appendix C Menu maps 162 ZP2 A Series Installation Manual...
Страница 172: ...Appendix D Regulatory information 166 ZP2 A Series Installation Manual...
Страница 176: ......