Chapter 3: Configuration and commissioning
ZP2-A Series Installation Manual
133
Commissioning
After the control panel and corresponding devices are installed and configured,
the system must be commissioned.
Check the following:
• That the fire system is designed, installed, and configured in accordance with
all required regulations and standards
• That the maximum alarm current in your installation does not exceed the
maximum current specifications of the power supply
• That all equipment is correctly installed and tested and that all cabling
complies with the recommendations outlined in “Recommended cables” on
page 31
• That all software functions are correctly programmed
• That all installed detectors are appropriate for installation environment and
operate correctly
• That all inputs and outputs operate correctly
• That any input/output logic (rules and actions) configuration is correct
• That the fire system is functioning correctly in standby and is not reporting
any alarms or faults
• That under the alarm conditions (with all applicable devices activated), the
current consumption does not exceed the power supply specifications (if the
batteries are not activated the current consumption is within the
specifications)
Содержание ZP2-AF2-P
Страница 1: ...ZP2 A Series Installation Manual P N 00 3281 501 2003 01 ISS 22NOV22...
Страница 50: ...Chapter 2 Installation 44 ZP2 A Series Installation Manual...
Страница 140: ...Chapter 3 Configuration and commissioning 134 ZP2 A Series Installation Manual...
Страница 153: ...Chapter 5 Technical specifications ZP2 A Series Installation Manual 147 Figure 29 Large cabinet dimensions and views...
Страница 154: ...Chapter 5 Technical specifications 148 ZP2 A Series Installation Manual Figure 30 Small cabinet dimensions and views...
Страница 168: ...Appendix C Menu maps 162 ZP2 A Series Installation Manual...
Страница 172: ...Appendix D Regulatory information 166 ZP2 A Series Installation Manual...
Страница 176: ......