14
DDOC0021
1 / h
EN / 2020-08-15
Zimmer GmbH
•
Im Salmenkopf 5
•
77866 Rheinau, Germany
•
+49 7844 9138 0
•
+49 7844 9138 80
•
www.zimmer-group.com
INSTALLATION AND OPERATING INSTRUCTIONS:
Gripper, electric, GEP5000/GED5000 series
INFORMATION:
The cables that are used by Zimmer GmbH feature a minimum bending radius of 10 x the outer diame-
ter.
This bending radius must not be undershot!
Ö
All IO-Link cables that are installed in the grippers have an outer diameter of 5 mm and thus have a
bending radius of 50 mm.
Ö
Freely suspended cables must be secured to prevent excessive motion loads or pinching.
7.3.2 Installing the GEP/GED5000IL “IO-Link”
PIN assignment of the power supply line:
PIN
Color
Function
Explanation
1
Brown
24 V DC Power supply for IO-Link communication
2
White
Ac 24 V
DC
Actuator supply voltage
3
Blue
GND sensor
Sensor 0 V DC supply voltage
4
Black
C/Q
IO-Link communication
5
Gray
GND actuator
Actuator 0 V DC supply voltage
The following steps must be carried out for commissioning or installing the gripper with IO-Link:
►
Connect the gripper to the IO-Link master.
►
Secure the voltage supply.
For Port Class A, additional power supply via Y-cable.
7.3.3 Installing the GEP/GED5000IO “Digital”
PIN assignment of the power supply line:
PIN
Color
Function
Explanation
1
White
DIR
Input, control input, open/close gripper,
24 V DC
2
Brown
WorkPosition
Output, “gripper in work position” mes-
sage
3
Green
Error
Output, “error” message
4
Yellow
TeachPosition
Output, “Gripper in programming posi-
tion” message
5
Gray
BasePosition
Output, “Gripper in base position” mes-
sage
6
Pink
+ 24 V DC
Supply voltage 24 V DC/5 A
7
Blue
Teach/Adjust
Input, control input, program/adjust
workpiece
8
Red
GND
0 V DC supply voltage
4
2
1
6
8
7
5
3