A5.6
Checking the encoder
•
Is the encoder connected in the way shown in the connection proposal A8? Should external encoders
be connected, you have to check whether the technical data are met.
•
Is the monitor connected in the right way?
•
Observe the real speed at the control device: /MONITOR/N_REAL
•
Open the brake manually and observe the real speed.
If the control device does not register any speed:
- Check the voltage of the transmitter supply:
ET1
ET2
ET3
ET4
ET5
+15V
track A
track B
GND
-15V
In case of slow motor rotation (open brake manually for a short time), the voltage levels at terminal "ET2"
resp. "ET3" have to change b and -.
- Current consumption in "ET2" and "ET3" typ. +7 mA /-1mA.
It is further possible to check the following two points by means of an oscilloscope or another multimeter
of high-quality:
- The pulse/pause ratio has to be 50 %.
- The phases of track A and B are shifted by 90°.
Содержание ZETADYN 1DV Series
Страница 2: ...http www bzxindaxin com http www gk world com 全球独家推出 全覆盖型省配线解决方案 ...
Страница 3: ...http www bzxindaxin com http www gk world com ...
Страница 4: ...http www bzxindaxin com http www gk world com ...
Страница 5: ...http www bzxindaxin com http www gk world com ...
Страница 6: ......
Страница 63: ......