Commissioning 39
5. Commissioning
5.1
Requirements
When commissioning the device locally, no measuring instruments are required.
Before starting the commissioning, the following points have to be checked:
1. The control device is installed and connected according to this description.
2. The operation of the device and the adjustment possibilities are well-known.
3. The control of the device is executed and checked according to this description.
The drive may be put into operation only if these three conditions are fulfilled.
Commissioning can be carried out in accordance with the brief instructions supplied with the equipment.
The control parameters must be adjusted to suit the installation before the first run.
Observe all instructions contained on these pages.
If the controller is of special design, refer to the supplementary instructions before starting the
commissioning procedure.
Before moving off, always ensure that no persons
or objects are in the way.
Содержание ZETADYN 1DV Series
Страница 2: ...http www bzxindaxin com http www gk world com 全球独家推出 全覆盖型省配线解决方案 ...
Страница 3: ...http www bzxindaxin com http www gk world com ...
Страница 4: ...http www bzxindaxin com http www gk world com ...
Страница 5: ...http www bzxindaxin com http www gk world com ...
Страница 6: ......
Страница 63: ......