21
PRKB24C01AG & PRKB24C01AS-OD Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
13. Calibrate the regulator. Refer to page 22 for
detailed instructions.
14. Place the CO₂ tank upright inside the left
corner of the kegerator and secure using the
Velcro strap shown in FIG. J.
15. Place the beer keg inside the kegerator.
16. Power on the kegerator and set to the desired
temperature. We recommend waiting at least
24 hours before dispensing beer to allow the
keg to get to temperature and settle.
17. Attach (5) clear rubber pads underneath the
drip tray and place drip tray in front of the tap
tower under the tap (FIG. K).
18. Enjoy your beer!
TIP:
While the beer line cooling system will help
keep the beer lines cool and minimize foam, it is
important to fully pull on the tap handle when
pouring your beer. Not fully pulling the tap handle
will result in excess foam.
FIG. J
FIG. K
Installing the Kegerator