27
PRKB24C01AG & PRKB24C01AS-OD Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
5. Install the tap tower by guiding the beer
line through the opening on top of the
kegerator. Secure the tap tower to the
threaded countertop flange using the
(4) M5 x 8 screws included with the built-
in kit rather than the (4) M5 x 16 screws
included with the tap kit (FIG. P).
NOTE:
If you are installing a double or triple
tap, apply the included “Left Tap Label” and
“Right Tap Label” stickers to the relevant
beer lines before mounting the tower.
6. Reinstall the air conduit by using the (2)
previously removed screws.
7. Complete the tap assembly by following
steps 5-18 on pages 19-21.
FIG. P
Built-In Kit Installation