19
PRKB24C01AG & PRKB24C01AS-OD Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Wrench
5. Attach the tap to the tap tower as shown in
FIG. B. Make sure the tap is aligned properly
and turn the nut counterclockwise by hand.
Fully tighten using the included wrench.
6. Screw the tap handle onto the tap shown in
FIG. C.
NOTE:
Tap handles are use a standard 3/8”-16
UNC thread to accommodate aftermarket tap
handles.
7. Ensure the hand valve on the CO₂ tank is
closed. Attach the regulator to the filled CO₂
tank and hand tighten the inlet connection
nut (FIG. D). Use a wrench for an additioanl
quarter turn, making sure to not overtighten
the nut.
8. Attach the gas line to the hose barb on the
regulator shown in FIG. E. Secure using the
included metal clamp and tighten using a
flathead screwdriver.
9. Connect the keg coupler to the beer keg, but
first make sure the handle of the keg coupler
is disengaged in the diagonal/upper position.
Refer to FIG. F for clarification. Insert the
keg coupler into the beer keg and turn 25°
clockwise to lock into place. Do not engage the
handle yet.
FIG. B
FIG. C
FIG. D
FIG. E
Installing the Kegerator