<5. Calibration>
5-6
IM 12K01B02-01E
2. Measure the requirement of acid potassium phthalate (special grade chemicals) following
the table above.
3. Pour approximately 500 mL of the zero solution (distilled water) into the 1 L beaker, and add
the measured acid potassium phthalate to dissolve thoroughly.
NOTE
The acid potassium phthalate dissolves easily when setting the temperature of the zero solution
from 40 8C to 50 8C.
4. Pour the solution in the 1 L beaker into the 2 L measuring flask, add zero solution to the
gauge line, and shake to dissolve the solution.
5.4.2
Common Zero Calibration
MEAS. screen
CALIBRATION screen
[CAL.]
[UV/VIS]
Refer to “5.3 Calibration Screen Display”
UV/VIS CAL. screen
• Preparation
Plastic bucket:
1 (diameter: approximately 30 cm)
Zero solution (distilled water): approximately 3 L
Calibration tank:
1
2 L Measuring flask:
1
Cleaning
bottle:
1
• Calibration procedure
1. Press [UV/VIS] on the CALIBRATION screen of converter.
Calibration item
[UV/VIS]
2. Clean the attached calibration tank with zero solution thoroughly, and pour the zero solution
to the scale.
3. Prepare the plastic bucket and pour the tap water.
Pour the tap water to a depth of approximately 9 cm
(so that the base of the detector imay not soak in the water).
4. Remove the detector from the measurement tank.
CAUTION
• When removing the detector, make sure not to lose wing nuts.
• As the UV lamp is illuminated, work with an eye protector. The UV lamp should not be
viewed directly as your eyes may be damaged.
Содержание UV700G
Страница 5: ...Blank Page ...
Страница 15: ...Blank Page ...
Страница 35: ...Blank Page ...
Страница 39: ...Blank Page ...
Страница 115: ...Blank Page ...
Страница 117: ...Blank Page ...
Страница 131: ...Blank Page ...