<App.2 Installation>
App.2-5
IM 12K01B02-01E
2. Use U bolts (large/M8) to attach the overflow tank to the pole. Make sure that there is a
distance of approximately 400 mm between the detector mount and the bottom of the
overflow tank.
Overflow tank
Tightening plates
U bolts (large)
M8 nuts (4)
M8 SWs (4)
M8 flat washers (4)
400 mm
Earth logo
Fig.10 Overflow tank installation
3. Attach the pipe stay to the pipe unit (V-2 valve attached) temporally using a U bolt (small/
M5), and then fasten the pipe stay to the pole stand using another U bolt (large/M8). After
making sure that there is no excess pressure on the pipe unit, firmly fasten the U bolt (small/
M5) attached first.
U bolt (large)
M8 SW
M8 nut
Tightening plate
V-2 valve
Pipe stay
Pipe unit
U bolt (small)
M5 nut
M5 SW
M5 flat washer
Fig.11 Pipe stay installation
Содержание UV700G
Страница 5: ...Blank Page ...
Страница 15: ...Blank Page ...
Страница 35: ...Blank Page ...
Страница 39: ...Blank Page ...
Страница 115: ...Blank Page ...
Страница 117: ...Blank Page ...
Страница 131: ...Blank Page ...