App.1 Overview
App.1.1 Cautions
This manual provides the procedure for assembling and installing the UV meter and pole stand,
and cautions.
To obtain stable operation and reliable measurement of the UV meter for a long period of time,
you need correct installation work from setup through piping.
If the meter is not installed correctly, unexpected problems may occur such as incorrect analyzer
indications, frequent malfunctions, and increases in required inspection and maintenance.
Problems due to incorrect installation or use are not covered by the warranty. Be sure to fully
follow the manual.
App.1.2 Composition
For UV700G installation, both the UV meter itself and UV700G pole stand are required.
The following table shows the components included with the UV meter and pole stand.
Table 1 Components included with UV meter
Component
Name
Specifications
Quantity
Operation unit
UV700G operation unit
Standard specification (outdoor case)
1
Analysis unit
UV700G analysis unit
1
Overflow tank
Overflow tank
Float switch
1
U bolt (large) set
M8, screw nut
2
Pipe stay set
Pipe, U bolt, screw nut
1
Hose set
1.2 m, with one-touch joint
1
Measuring tank
and accessory
Measuring tank
1
Blind plate 1
1
Calibration tank
2
V-4 pipe set
V-4 valve, pipe
1
V-2 pipe set
V-2 valve, T-pipe
1
Y-pipe set
Y-pipe, hose clip
1
M8 bolt set
Used for attaching the measuring tank
4
Accessories for analysis unit
Drying agent, calibrating solution,
wiper, washer
1
UV700G User’s Manual
Standard specification
1
Table 2 Components included with the pole stand
Component
Name
Specifications
Quantity
Pole stand
UV700G pole stand
Standard specification
1
Detector mount,
Converter bracket
UV700G detector mount
Detector mount
1
Converter bracket
Converter bracket
1
Содержание UV700G
Страница 5: ...Blank Page ...
Страница 15: ...Blank Page ...
Страница 35: ...Blank Page ...
Страница 39: ...Blank Page ...
Страница 115: ...Blank Page ...
Страница 117: ...Blank Page ...
Страница 131: ...Blank Page ...