<Toc>
<3. Programming>
3-17
IM 05E01B02-41E
Parameter
Symbol
Name of Parameter
Setting Range and Description
Initial Value
User
Setting
Target Item
in CD-ROM
Local event-22 type
Same as the E21A parameter.
E22A
Local event-22
setpoint
Same as the E21B parameter.
E22B
Local event-23 type
Same as the E21A parameter.
E23A
Local event-23
setpoint
Same as the E21B parameter.
E23B
Local event-24 type
Same as the E21A parameter.
E24A
Local event-24
setpoint
Same as the E21B parameter.
E24B
Local event-25 type
Same as the E21A parameter.
E25A
Local event-25
setpoint
Same as the E21B parameter.
E25B
Local event-26 type
Same as the E21A parameter.
E26A
Local event-26
setpoint
Same as the E21B parameter.
E26B
Local event-27 type
Same as the E21A parameter.
E27A
Local event-27
setpoint
Same as the E21B parameter.
E27B
Local event-28 type
Same as the E21A parameter.
E28A
Local event-28
setpoint
Same as the E21B parameter.
E28B
Ref.5.2(9)
●
Program Parameters (Parameters for Setting the Conditions of Program
Operation Startup)
Use the program pattern setup chart discussed in “3.2 Example of Program Pattern Setup
Charts” of this chapter, to record your setpoints of program parameters.
Located in: Main menu =
PROG
; Submenu =
PRG
Parameter
Symbol
Name of Parameter
Setting Range and Description
Initial Value
Pattern number
1: Program pattern 1 2: Program pattern 2
3: Program pattern 3
4 to 300: Likewise, specifying these numbers sets their
corresponding program pattern numbers.
Segment number
0: Shows parameters for setting the starting target setpoint,
start code, etc.
1 to 99: Specify the corresponding segment numbers.
Specify “0” when creating a program for the first time.
0
User
Setting
Target Item
in CD-ROM
SEG
PTN
Starting target setpoint
0.0 to 100.0% of PV input range
0.0% of PV
input range
SSP1
Start code
-1: Shows parameters for setting the wait and repeat actions.
0: Program operation begins with the starting target setpoint.
1: Ramp-prioritized PV start (program operation begins with
the PV value by giving priority to the ramp of segment 1)
2: Time-prioritized PV start (program operation begins with
the PV value by giving priority to the time of segment 1)
TIP: The option “-1” is not a setpoint.
0
STC
ᎏ
ᎏ
Ref.5.2(1)
1st Edition : May 31,2000-00
Содержание UP750
Страница 2: ...Blank Page...
Страница 22: ...Blank Page...
Страница 120: ...Blank Page...
Страница 128: ...Blank Page...
Страница 130: ...Blank Page...