2.6 Selecting Peripheral Devices
2-11
2
2.6.2 Molded-case Circuit Breaker and Fuse Capacity
* 1. Nominal value at the rated load. The specified derating is required to select an appropriate
fuse capacity.
* 2. Cutoff characteristics (25
°
C): 300% five seconds min. and inrush current of 20ms.
* 3. A preventive circuit for inrush current is not built in the 24 VDC control power supply. The
protective circuit must be designed by the customer.
* 4. Make sure the current capacity is accurate. For the SERVOPACK with the cooling fan built-
in, an inrush current flows; 200 % of the current capacity in the table above for two seconds,
when turning ON the control circuit power supply to start the fan working.
Note: Do not use a fast-acting fuse. Because the SERVOPACK’s power supply is a capacitor
input type, a fast-acting fuse may blow when the power is turned ON.
The SGDH SERVOPACK does not include a protective grounding circuit. Install a ground-fault protector
to protect the system against overload and short-circuit or protective grounding combined with the molded-
case circuit breaker.
Main
Circuit
Power
Supply
SERVOPACK
Model
Power Supply
Capacity per
SERVOPACK
(kVA)
Current Capacity of the
Molded-case Circuit Breaker
and the Fuse (A
rms
)
∗
1,
∗
2
(Refer to 6.8.7)
Inrush Current
Capacity
(kW)
SGDH
-
Main Circuit
Power Supply
Control Cir-
cuit Power
Supply
Main Circuit
Power Supply
Control Cir-
cuit Power
Supply
Single-
phase
200 V
0.05
A5AE
0.25
4
0.13
63A
60A
0.10
01AE
0.40
0.20
02AE
0.75
0.40
04AE
1.2
8
Three-
phase
200 V
0.45
05AE
1.4
4
0.15
∗
4
118A
60A
0.75
08AE
1.9
7
1.0
10AE
2.3
1.5
15AE
3.2
10
2.0
20AE
4.3
13
63A
3.0
30AE
5.9
17
5.0
50AE
7.5
28
67A
7.5
75AE
15.5
41
0.27
∗
4
40A
Three-
phase
400 V
0.45
05DE
1.1
1.6
0.7
∗
4
10A
(24 VDC)
∗
3
1.0
10DE
2.3
3.4
1.5
15DE
3.2
4.6
2.0
20DE
4.9
7.1
20A
3.0
30DE
6.7
9.7
5.0
50DE
10.3
14.9
78A
7.5
75DE
15.4
22.3
1.2
∗
4
20A
IMPORTANT
Содержание SGLFW
Страница 270: ...9 3 9...