![YASKAWA SGD7S-R70A Скачать руководство пользователя страница 108](http://html1.mh-extra.com/html/yaskawa/sgd7s-r70a/sgd7s-r70a_product-manual_3477694108.webp)
7.3 Program Table Operation
7.3.7 Program Table Operation Examples
7-27
7
Operation with Digital I/O
7.3.7
Program Table Operation Examples
This section provides the following 12 examples to show the timing of the I/O signals related to
program table operation.
In the following examples, it is assumed that homing has been completed to define the origin.
Refer to the following section for a timing chart from when the power supply to the equipment
is turned ON until homing is completed when an incremental encoder is used.
No.
Item
Reference
1
Specifying the Program Steps to Execute One at a Time
2
Specifying the Next Step to Execute in the NEXT Setting
3
Specifying the Number of Times to Execute a Program Step
4
Pausing Program Table Operation
5
Outputting POUT Signals for the Specified Time
6
Specifying SEL Signals as Events
7
Combining Positioning with Constant-Speed Operation
8
Performing Registration
9
Pausing Registration
10
Turning ON the /RGRT Signal While Program Table Operation Is Stopped
11
Using Consecutive Stops
12
Resetting Program Table Operation