
2.2 MP3300 Installation
2.2.5 Battery Installation and Replacement
2-34
Battery Installation
1.
Confirm that the power supply to the MP3300 is turned OFF.
2.
Open the battery cover on the front of the Base Unit.
3.
Securely connect the lead connector of the Battery to the connector in the Base Unit,
and insert the Battery into the battery holder.
4.
Close the battery cover and turn ON the CPU Module.
5.
Installation of the Battery is complete when the RDY indicator on the CPU Module goes
out.
The CPU Module comes with one Battery. The Battery is not connected when the Module is
delivered.
Important
CAUTION
Suitable Battery installation must be performed and it must be performed only by an
experienced technician.
There is a risk of electrical shock, injury, or device damage.
Do not touch the electrodes of the Battery.
Static electricity may damage the electrodes.
YASKAW
A
CPU-301
LIO-01
LIO-02
LIO-04
RDY
RUN
ALM
ERR
BAT
M-ALM
LD1
LD2
LD3
STOP
E-INIT
INIT
CNFG
LOAD
TEST
MNT
LD4
MODE
I/O
I/O
MODE
LD5
LD6
LD7
LD8
LD1
CN1
LD2
LD3
LD4
LD5
HUB
LD6
LD7
LD8
POWER
CN1
100V/200V
CN2
DC
24V
DC
0V
Ethenet
CN2
YASKAW
A
MBU-303
LIO-01
LIO-02
POWER
RDY
RUN
ALM
ERR
BAT
M-ALM
STOP
E-INIT
INIT
CNFG
LOAD
TEST
MNT
CPU-301
LD1
LD5
LD6
LD7
LD8
LD
LD
LD
LD
LD2
LD3
LD4
LD1
LD2
LD3
LD4
MODE
MODE
I/0
I/0
CN
LK1
U55
LK2
M-III
LITHIUM
Содержание MP3000 Series
Страница 153: ...4 1 User Program Types and Execution Timing 4 1 2 Motion Programs 4 20 Ladder Program Example...
Страница 212: ...5 4 Tuning 5 70 5 4 1 Using SigmaWin When Using a Servo 5 70 5 4 2 Using DriveWizard Plus When Using an Inverter 5 70...
Страница 274: ...5 3 Monitoring Machine Operation 5 3 3 Realtime Tracing 5 64...