![background image](http://html1.mh-extra.com/html/yardline/ridgepointe/ridgepointe_assembly-manual_3177253013.webp)
11
FINISH
LEVEL AND SQUARE FLOOR FRAME
Before attaching f oor decking, it is important to level and square the f oor frame.
A level and square f oor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying fl oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the
frame is square. The diagonal measurement will be approximately 185-1/8" (470,2 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of
each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of
each runner making sure the frame remains square
(Fig. A)
.
Once the fl oor frame is level and square, fasten the frame to the 4x4 runners at each point
where the frame contacts the 4x4 runners.
See page 12 for the preferred fl oor leveling method.
First, secure at ends with one fastener.
Second, secure at ends with one fastener.
185-1/8"
(470,2 cm)
185-1/8"
(470,2 cm)
Fig. A
120"
(304,8 cm)
141"
(358,1 cm)
Содержание RIDGEPOINTE
Страница 2: ...This page intentionally left blank...