
15
Right Wall
Left Wall
Front Wall
Back Wall
• The foor should be used as a level work surface for wall construction.
• Organize your wall sections during sub-assembly to avoid over-handling of the walls.
HINT:
Ensure the foor frame is level after installing foor panels.
Re-level foor if necessary.
IMPORTANT!
Содержание RIDGEPOINTE
Страница 2: ...This page intentionally left blank...