
34
Assemble gable unit panels with the primed side facing up.
BACK GABLE UNIT
PARTS REQUIRED:
1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
5-7/16"
(13,8 cm)
Install center gable panel on (2)
FOB
.
Secure with 1-1/2" nails spaced evenly.
1
BEGIN
2
Install left and right gable panels fl ush
to installed panel.
Secure with 1-1/2" nails spaced evenly.
Flush
Flush
FOB
(x2, on f at)
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
x24
FOB
x2
2 x 4 x 34" (5,1 x 10,2 x 86,4 cm)
x1
x1
x1
Flush
Flush
FINISH
Your back gable unit is now assembled.
Содержание RIDGEPOINTE
Страница 2: ...This page intentionally left blank...